Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

Airborne Remote Sensing Services Fees Order, 1989 (SOR/89-235)

Regulations are current to 2024-08-18

SCHEDULE(Section 3)

Fees and Charges for Airborne Remote Sensing Services

ItemColumn IColumn II
DescriptionFees and Charges
1Production, by special arrangement with the Canada Centre for Remote Sensing Airborne Operations Section, of single channel of annotated quicklook image on VHS video cassette or on dry silver paper from image HDDT recorded by the CCRS Airborne Operations Section, per system hour (charges under item 9(a) not included)$  210.00
2Transcription of data from HDDT recorded by CCRS Operational Airborne Sensor System to CCT,
  • (a) per mount of HDDT

341.00
  • (b) per CCT (9 track, 6,250 bpi, 2,400 ft. reel) produced from same mount of HDDT

105.00
3Production of digital SAR imagery by processing SAR signal CCT originating from item 2(b) to SAR image CCT (9 track, 6,250 bpi, 2,400 ft. reel), including 0.2 m × 0.25 m Polaroid print of image on tape, per input block, or portion thereof, of 8,192 range lines (independent of the number of range samples in each range line)1,102.00
4Geometric correction of image on CCT originating from item 2(b), 3 or 5 for each group of spatially coincident spectral bands independent of the number of spectral bands per group (9 track, 6,250 bpi, 2,400 ft. reel),
  • (a) standard geometric image processing with aircraft motion removed, per million output pixels

105.00
  • (b) product registration to ground control points

  • (i) set-up, per flight line

210.00
  • (ii) processing, per million output pixels

105.00
  • (c) comparative geometric product registration to common control points in another scene

  • (i) set-up, per flight line

210.00
  • (ii) processing, per million output pixels

105.00
5Radiometric processing of image on CCT originating from item 2(b) or item 4 (9 track, 6,250 bpi, 2,400 ft. reel),
  • (a) line summing to improve signal to noise ratio and dynamic range in linear array scanner imagery (MEIS II) (independent of number of spectral bands), per million output pixels

5.20
  • (b) reflectance transformation of a single band of linear array scanner imagery (MEIS II), per million output pixels

5.20
6Standard processing of scatterometer data on CCT, originating from item 2(b), to backscatter cross sections, by special arrangement with a Canada Centre for Remote Sensing project scientist,
  • (a) for first minute of a flight line

210.00
  • (b) for each additional minute of a flight line

21.00
7Transcription of CCT’s, delivered to Canada Centre for Remote Sensing, from 9 track, 6,250 bpi, 2,400 ft. reel to:
  • (a) 9 track, 1,600 bpi, 1,200 or 2,400 ft. reel or

  • (b) 9 track, 800 bpi, 1,200 or 2,400 ft. reel, per output reel (charges under item 9(b) not included

10.00
8Master negative from remotely sensed imagery on CCT (Standard format also known as LANDSAT ground station operators working group format) or HDDT recorded by CCRS operational airborne sensor system (NAPL charges for photographic processing not included) per frame of imagery
  • (a) 185 mm black and white negative

65.00
  • (b) 185 mm colour negative

130.00
9Materials expended
  • (a) for purposes of item 1:

  • (i) per 60 minute VHS video cassette

8.70
  • (ii) 150 mm quicklook type 7772 dry silver paper, per metre

1.20
  • (iii) 220 mm width (Integrated Radar Imaging System) type 7772 dry silver paper, per metre

2.80
  • (b) for purposes of item 7:

  • (i) CCT (½ in. × 1,200 ft.), per 8½ in. reel

12.60
  • (ii) CCT (½ in. × 2,400 ft.), per 10½ in. reel

21.00
10Handling, including packing, invoicing, shipment made by parcel post and postage to Canadian (not foreign) destinations, per shipment of data10.50
 

Date modified: