Government of Canada / Gouvernement du Canada
Symbol of the Government of Canada

Search

National Parks Building Regulations (C.R.C., c. 1114)

Regulations are current to 2024-11-26

SCHEDULE(Subsections 11.1(8) to (10) and 15(1))

PART I

Fees for Permits

Column IColumn II
ItemType of PermitFee ($)
1Building permit, per $1,000 or fraction thereof of estimated value of the building or structure
  • (a) in Banff or Jasper National Park blank line

7.00
  • (b) in any other park blank line

5.00
2Plumbing installation permit
  • (a) for installing, altering, extending or renewing, not more than one soil or other stack and not more than four fixtures blank line

40.00
  • (b) for each additional stack and each additional fixture to be installed, altered, extended or renewed blank line

10.00
3Appliance installation permit blank line10.00
4Electrical installation permit, for each installation, with estimated cost of
  • (a) not more than $300 blank line

30.00
  • (b) more than $300 but not more than $1,000 blank line

30.00 plus 3 for each 100 or fraction thereof more than 300
  • (c) more than $1,000 but not more than $5,000 blank line

51.00 plus 1.50 for each 100 or fraction thereof more than 1,000
  • (d) more than $5,000 but not more than $50,000 blank line

111.00 plus 1.00 for each 100 or fraction thereof more than 5,000
  • (e) more than $50,000 but not more than $1,000,000 blank line

561.00 plus 0.75 for each 100 or fraction thereof more than 50,000
  • (f) more than $1,000,000 blank line

7,686.00 plus 0.50 for each 100 or fraction thereof more than 1,000,000
5Service connection permit for electrical installation, per connection blank line3.00
6Gas installation permit, for each installation with estimated cost of
  • (a) not more than $1,000 blank line

25.00
  • (b) more than $1,000 but not more than $10,000 blank line

25.00 plus 2.00 for each 100 or fraction thereof more than 1,000
  • (c) more than $10,000 but not more than $50,000 blank line

205.00 plus 1.00 for each 100 or fraction thereof more than 10,000
  • (d) more than $50,000 blank line

605.00 plus 0.50 for each 100 or fraction thereof more than 1,000,000
7
  • (1) Installation permit for a new or replacement liquified petroleum tank with a capacity of not more than 9,000 L and not less than 1,125 L blank line

20.00
  • (2) Installation permit for liquified petroleum first and second stage regulators and piping or tubing from a liquified petroleum tank to a building blank line

10.00

PART II

Fees for Services

Column IColumn II
ItemType of ServiceFee ($)
1Gas installation inspection, per hour blank line40.00
2Review of plans and specifications for a gas installation, per hour blank line12.00
  • SOR/81-667, s. 3
  • SOR/85-509, s. 1
  • SOR/96-427, s. 2
 

Date modified: