Mackenzie Valley Land Use Regulations
Version of section 9 from 2013-09-30 to 2024-11-26:
9 (1) [Repealed, SOR/2013-166, s. 6]
(2) Unless otherwise authorized by a permit or in writing by an inspector, every permittee shall, before the completion of the land-use operation or the commencement of spring break-up, whichever occurs first,
(a) remove any material or debris deposited in a watercourse in the course of a land-use operation, whether for the purpose of constructing a crossing or otherwise; and
(b) restore the channel and bed of the watercourse to their original alignment and cross-section.
- SOR/2013-166, s. 6