Mackenzie Valley Land Use Regulations
19 (1) An application for a permit shall be submitted to the Board.
(2) An application for a permit shall be in the form, and provide the information, set out in Schedule 2.
(3) Subject to section 20, an application under subsection (1) shall be accompanied by the application fee and any applicable land-use fee set out in Schedule 1, and by a preliminary plan, prepared in accordance with section 30, that shows
(a) the lands proposed to be used in the land-use operation and an estimate of their area; and
(b) the approximate location of all
(i) existing lines, trails, rights-of-way and cleared areas proposed to be used in the land-use operation,
(ii) new lines, trails, rights-of-way and cleared areas proposed to be used in the land-use operation,
(iii) buildings, structures, campsites, air landing strips, air navigation aids, fuel and supply storage sites, waste disposal sites, excavations and other works and places proposed to be constructed or used in the land-use operation, and
(iv) bridges, dams, ditches, railroads, roads, transmission lines, pipelines, survey lines, monuments, historical and archaeological sites, burial grounds, air landing strips, watercourses, traplines and cabins that may be affected by the land use operation.
(4) For the purpose of calculating the applicable land-use fee payable under subsection (3), the width of any line, trail or right-of-way proposed to be used in the land-use operation shall, unless otherwise specified in the permit, be considered to be 10 m.