Multi-Sector Air Pollutants Regulations
Marginal note:Classification reports — sections 34 and 35
41 (1) A classification report — in respect of a determination of a boiler’s or heater’s classification NOx emission intensity made under subsection 34(1) or 35(1) — that contains the information set out in Schedule 5 must be provided to the Minister not later than
(a) for a determination made under subsection 34(1),
(i) if the determination was made by means of a test referred to in paragraph 34(1)(a), the day that is 18 months after the day on which these Regulations are registered, and
(ii) in any other case, the day that is 12 months after the day on which these Regulations are registered; and
(b) for a determination made under subsection 35(1), the earlier of
(i) the day that is six months after the day on which this Part first applied in respect of the boiler or heater, and
(ii) December 31, 2022.
Marginal note:Classification reports — 2023, 2024 and 2025
(2) A classification report — in respect of a pre-existing boiler or heater that, in 2023, 2024 or 2025, is deemed under subsection 12(2) to be class 80 and to have a classification NOx emission intensity of 80 g/GJ — that contains the information set out in Schedule 5 must be provided to the Minister by the earlier of
(a) the day that is six months after the day on which this Part first applied in respect of the boiler or heater, and
(b) December 31, 2025.
- Date modified: