Multi-Sector Air Pollutants Regulations
Marginal note:Three test runs
27 (1) A stack test consists of three consecutive test runs conducted within a period of 48 hours, each of which lasts at least 30 minutes and results in a determination of the boiler’s or heater’s NOx emission intensity.
Marginal note:Operating conditions for test runs
(2) The test runs must be conducted while the boiler or heater meets the following conditions:
(a) it is operating with at least 50% of the input energy in its combustion chamber resulting from the introduction of gaseous fossil fuel;
(b) it is operating at at least 60% of its rated capacity;
(c) it is operating at a steady state;
(d) it is operating with preheated air, if it is equipped to preheat air; and
(e) the same type of gaseous fossil fuel — natural gas or alternative gas — is introduced into its combustion chamber.