Nunavut Mining Regulations
Version of section 80 from 2020-11-01 to 2024-11-26:
Marginal note:Extension on account of strike
80 If, as a result of a strike, as defined in subsection 2(1) of the Federal Public Sector Labour Relations Act, a holder of a recorded claim or lease is unable, through no fault on their part, to do a thing within the time required by these Regulations, the deadline for doing that thing is extended for a period ending 15 days after the last day of the strike.
- 2017, c. 9, s. 58
- SOR/2020-209, s. 27
- Date modified: