International Bridges and Tunnels Regulations
Version of section 13 from 2012-03-14 to 2024-11-26:
13 (1) An owner of an international bridge shall submit to the Minister a report on an evaluation of the bridge’s capacity to carry traffic loads within 60 days after the day on which the evaluation is completed.
(2) The owner of the international bridge shall ensure that the report is signed and sealed by two engineers.
(3) [Repealed, SOR/2012-33, s. 5]
- SOR/2012-33, s. 5
- Date modified: