﻿<?xml version="1.0" encoding="utf-8"?><Regulation lims:pit-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:current-date="2019-06-21" lims:inforce-start-date="2006-03-22" lims:fid="527583" lims:id="527583" regulation-type="SOR" xml:lang="en" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2006-03-22" lims:fid="527584" lims:id="527584"><InstrumentNumber>C.R.C., c. 1537</InstrumentNumber><ConsolidationDate lims:inforce-start-date="2006-03-22"><Date><YYYY>2019</YYYY><MM>6</MM><DD>22</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2006-03-22" lims:fid="527586" lims:id="527586"><XRefExternal reference-type="act" link="T-7">TERRITORIAL LANDS ACT</XRefExternal></EnablingAuthority><ShortTitle lims:inforce-start-date="2006-03-22" lims:fid="527587" lims:id="527587">Withdrawal of Certain Lands (Lockhart River N.W.T.) from Disposal Order</ShortTitle><LongTitle lims:inforce-start-date="2006-03-22" lims:fid="527588" lims:id="527588">Order Withdrawing from Disposal, Setting Apart and Appropriating Certain Lands in the Northwest Territories for the Purpose of the Development of Hydro Electric Power</LongTitle></Identification><Body lims:inforce-start-date="2006-03-22" lims:fid="527589" lims:id="527589"><Heading lims:inforce-start-date="2006-03-22" lims:fid="527590" lims:id="527590" level="1"><TitleText>Short Title</TitleText></Heading><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527591" lims:id="527591"><Label>1</Label><Text>This Order may be cited as the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1537">Withdrawal of Certain Lands (Lockhart River N.W.T.) from Disposal Order</XRefExternal>.</Text></Section><Heading lims:inforce-start-date="2006-03-22" lims:fid="527592" lims:id="527592" level="1"><TitleText>Withdrawal from Disposal</TitleText></Heading><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527593" lims:id="527593"><Label>2</Label><Text>It is hereby ordered, for the purpose of future development of hydro electric power by the Northern Canada Power Commission, to withdraw from disposal under the <XRefExternal reference-type="act" link="T-7">Territorial Lands Act</XRefExternal> the lands described in the schedule, including the minerals underlying such lands, without prejudice to the rights of holders of recorded mineral claims in good standing.</Text></Section><Heading lims:inforce-start-date="2006-03-22" lims:fid="527594" lims:id="527594" level="1"><TitleText>Setting Apart and Appropriation</TitleText></Heading><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527595" lims:id="527595"><Label>3</Label><Text>The lands described in the schedule are set apart and appropriated for the purpose of future development of hydro electric power by the Northern Canada Power Commission.</Text></Section></Body><Schedule lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527596" lims:id="527596" spanlanguages="no" bilingual="no"><ScheduleFormHeading lims:inforce-start-date="2006-03-22" lims:fid="527597" lims:id="527597"><Label>SCHEDULE</Label><OriginatingRef>(Sections 2 and 3)</OriginatingRef></ScheduleFormHeading><Provision lims:inforce-start-date="2006-03-22" lims:fid="527598" lims:id="527598" format-ref="indent-0-0" language-align="no" list-item="no"><Text>All and singular that certain parcel or tract of land and land covered by water situate, lying and being on the Lockhart River, in the Northwest Territories, and being more particularly described as follows, all topographic features hereinafter referred to being according to the Parry Falls map sheet number 75 K/15 produced in 1961, at a scale of 1:50,000 by the Department of Energy, Mines and Resources, at Ottawa, Ontario:</Text><Provision lims:inforce-start-date="2006-03-22" lims:fid="527599" lims:id="527599" format-ref="indent-0-0" language-align="no" list-item="no"><Text>COMMENCING at a peak having an elevation of about 750 feet, said peak lying northerly of the Lockhart River at approximate latitude 62°49′15″ and longitude 108°52′00″;</Text></Provision><Provision lims:inforce-start-date="2006-03-22" lims:fid="527600" lims:id="527600" format-ref="indent-0-0" language-align="no" list-item="no"><Text>THENCE, northeasterly in a straight line to a peak having an elevation of about 1,250 feet, at approximate latitude 62°51′30″ and longitude 108°47′20″;</Text></Provision><Provision lims:inforce-start-date="2006-03-22" lims:fid="527601" lims:id="527601" format-ref="indent-0-0" language-align="no" list-item="no"><Text>THENCE, southeasterly in a straight line to the most northerly point on the bank of an unnamed lake, at approximate latitude 62°50′40″ and longitude 108°46′20″;</Text></Provision><Provision lims:inforce-start-date="2006-03-22" lims:fid="527602" lims:id="527602" format-ref="indent-0-0" language-align="no" list-item="no"><Text>THENCE, in a general southwesterly direction along the last aforesaid bank to its most westerly point;</Text></Provision><Provision lims:inforce-start-date="2006-03-22" lims:fid="527603" lims:id="527603" format-ref="indent-0-0" language-align="no" list-item="no"><Text>THENCE, southwesterly in a straight line to the most northerly point on the bank of an unnamed lake, at approximate latitude 62°49′40″ and longitude 108°47′15″;</Text></Provision><Provision lims:inforce-start-date="2006-03-22" lims:fid="527604" lims:id="527604" format-ref="indent-0-0" language-align="no" list-item="no"><Text>THENCE, southwesterly in a straight line to the most northerly point on the bank of an unnamed lake, at approximate latitude 62°48′45″ and longitude 108°50′30″;</Text></Provision><Provision lims:inforce-start-date="2006-03-22" lims:fid="527605" lims:id="527605" format-ref="indent-0-0" language-align="no" list-item="no"><Text>THENCE, northwesterly in a straight line to the point of commencement; all coordinates described above being Geodetic, referred to the 1927 North American datum; the said parcel containing 3.9 square miles, more or less.</Text></Provision></Provision></Schedule></Regulation>