﻿<?xml version="1.0" encoding="utf-8"?><Regulation lims:pit-date="2016-06-13" hasPreviousVersion="true" lims:lastAmendedDate="2016-06-13" lims:current-date="2019-06-21" lims:inforce-start-date="2016-06-13" lims:fid="527291" lims:id="527291" regulation-type="SOR" xml:lang="en" xmlns:lims="http://justice.gc.ca/lims"><Identification lims:inforce-start-date="2016-06-13" lims:fid="527292" lims:id="527292"><InstrumentNumber>C.R.C., c. 1527</InstrumentNumber><ConsolidationDate lims:inforce-start-date="2016-06-13"><Date><YYYY>2019</YYYY><MM>6</MM><DD>22</DD></Date></ConsolidationDate><EnablingAuthority lims:inforce-start-date="2016-06-13" lims:fid="527294" lims:id="527294"><XRefExternal reference-type="act" link="T-7">TERRITORIAL LANDS ACT</XRefExternal></EnablingAuthority><LongTitle lims:inforce-start-date="2016-06-13" lims:fid="527295" lims:id="527295">Territorial Quarrying Regulations</LongTitle></Identification><Body lims:inforce-start-date="2016-06-13" lims:fid="527296" lims:id="527296"><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527297" lims:id="527297"><Label>1</Label><Text><Repealed>[Repealed, SOR/2016-131, s. 2]</Repealed></Text></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527298" lims:id="527298" level="1"><TitleText>Interpretation</TitleText></Heading><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527299" lims:id="527299"><Label>2</Label><Text>In these Regulations,</Text><Definition lims:inforce-start-date="2016-06-13" lims:fid="527300" lims:id="527300" generate-in-text="no"><Text><DefinedTermEn>carving stone</DefinedTermEn> means serpentinite, argillite or soapstone that is suitable for carving; (<DefinedTermFr>pierre à sculpter</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527301" lims:id="527301" generate-in-text="no"><Text><DefinedTermEn>Crown</DefinedTermEn> means Her Majesty in right of Canada; (<DefinedTermFr>Couronne</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527302" lims:id="527302" generate-in-text="no"><Text><DefinedTermEn>Department</DefinedTermEn> means the Department of Indian Affairs and Northern Development; (<DefinedTermFr>Ministère</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527303" lims:id="527303" generate-in-text="no"><Text><DefinedTermEn>director</DefinedTermEn><Repealed>[Repealed, SOR/2016-131, s. 3]</Repealed></Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527304" lims:id="527304" generate-in-text="no"><Text><DefinedTermEn>dues</DefinedTermEn><Repealed>[Repealed, SOR/2016-131, s. 3]</Repealed></Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527305" lims:id="527305" generate-in-text="no"><Text><DefinedTermEn>loam</DefinedTermEn> means soil containing a mixture of sand, silt, clay and decomposed plant matter; (<DefinedTermFr>terreau</DefinedTermFr>) </Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527306" lims:id="527306" generate-in-text="no"><Text><DefinedTermEn>material</DefinedTermEn> means carving stone, loam or any naturally occurring inorganic substance used in construction, including gravel, sand, stone, limestone, granite, slate, marble, gypsum, shale, clay, marl and volcanic ash; (<DefinedTermFr>matière</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527307" lims:id="527307" generate-in-text="no"><Text><DefinedTermEn>Minister</DefinedTermEn> means the Minister of Indian Affairs and Northern Development; (<DefinedTermFr>ministre</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527308" lims:id="527308" generate-in-text="no"><Text><DefinedTermEn>permit</DefinedTermEn> means a valid and subsisting permit issued under these Regulations; (<DefinedTermFr>permis</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527309" lims:id="527309" generate-in-text="no"><Text><DefinedTermEn>permittee</DefinedTermEn> means the holder of a permit; (<DefinedTermFr>titulaire de permis</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527310" lims:id="527310" generate-in-text="no"><Text><DefinedTermEn>territorial land agent</DefinedTermEn> means a person designated by the Minister to perform the duties of territorial land agent under these Regulations and the <XRefExternal reference-type="regulation" link="C.R.C.,_c._1525">Territorial Lands Regulations</XRefExternal> for a land district established under the <XRefExternal reference-type="act" link="T-7">Territorial Lands Act</XRefExternal>; (<DefinedTermFr>agent des terres territoriales</DefinedTermFr>)</Text></Definition><Definition lims:inforce-start-date="2016-06-13" lims:fid="527311" lims:id="527311" generate-in-text="no"><Text><DefinedTermEn>territorial lands</DefinedTermEn><Repealed>[Repealed, SOR/2003-116, s. 17]</Repealed></Text></Definition><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527313" lims:id="527313">SOR/2003-116, s. 17; SOR/2016-131, s. 3</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527314" lims:id="527314" level="1"><TitleText>Application</TitleText></Heading><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527315" lims:id="527315"><Label>3</Label><Text>These Regulations apply only to territorial lands under the control, management and administration of the Minister.</Text></Section><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527316" lims:id="527316"><Label>3.1</Label><Text>In Nunavut, a permit or lease authorizing the quarrying of carving stone on Crown lands for carving purposes, or for the disposal of carving stone for carving purposes, may only be granted to a Designated Inuit Organization, in accordance with the <XRefExternal reference-type="other">Agreement Between the Inuit of the Nunavut Settlement Area and Her Majesty the Queen in Right of Canada</XRefExternal>.</Text><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527318" lims:id="527318">SOR/2016-131, s. 4</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527319" lims:id="527319" level="1"><TitleText>Staking</TitleText></Heading><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527320" lims:id="527320"><Label>4</Label><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527321" lims:id="527321"><Label>(1)</Label><Text>A person who desires to obtain a lease of territorial lands for the purpose of taking material from those lands shall stake those lands in the manner prescribed in this section.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527322" lims:id="527322"><Label>(2)</Label><Text>In the case of loam, the area staked shall not exceed 8.1 hectares, and in the case of any other material, the area shall not exceed 64.8 hectares.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527323" lims:id="527323"><Label>(2.1)</Label><Text>The length of the area staked shall not exceed twice its width.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527324" lims:id="527324"><Label>(3)</Label><Text>The area staked shall be rectangular in form except where a boundary of a previously staked tract is adopted as common to both areas.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527325" lims:id="527325"><Label>(4)</Label><Text>The land shall be marked by the applicant with posts firmly fixed in the ground, one at each corner; in areas where there is no timber, rock cairns may be used in lieu of posts.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527326" lims:id="527326"><Label>(5)</Label><Text>Each post shall be at least 10 centimetres square and when firmly planted shall be at least 1.2 metres above the ground.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527327" lims:id="527327"><Label>(6)</Label><Text>Each post shall bear markings showing the number of the post, the name of the applicant, the date of staking and the type of material to be removed.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527328" lims:id="527328"><Label>(7)</Label><Text>If a rock cairn is used, it shall be well constructed and at least 60 centimetres high and 60 centimetres in diameter at the base. A metal container shall be built into the cairn and shall contain a document bearing the number of the cairn, the name of the applicant, the date of staking and the type of material to be removed.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527329" lims:id="527329"><Label>(8)</Label><Text>In a timbered area, the lines between the posts shall be clearly marked.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527330" lims:id="527330"><Label>(9)</Label><Text>The applicant shall post a written or printed notice on a post or in a cairn setting out their intention to apply for a lease within the time prescribed by these Regulations.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527331" lims:id="527331"><Label>(10)</Label><Text>If two or more persons apply for the same area, the person who first staked the area in accordance with these Regulations shall be entitled to priority in respect of the issuance of a lease.</Text></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527333" lims:id="527333">SOR/2016-131, s. 5</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527334" lims:id="527334" level="1"><TitleText>Leases</TitleText></Heading><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527335" lims:id="527335"><Label>5</Label><Text>Territorial lands containing material may be leased by the Minister for the sole purpose of quarrying or removing material that is specified in the lease.</Text><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527337" lims:id="527337">SOR/2016-131, s. 6</HistoricalNoteSubItem></HistoricalNote></Section><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527338" lims:id="527338"><Label>6</Label><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527339" lims:id="527339"><Label>(1)</Label><Text>An application for a lease shall be filed with the territorial land agent of the land district in which the land is situated within 30 days from the date upon which it was staked.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527340" lims:id="527340"><Label>(2)</Label><Text>Every lease application shall be accompanied by the application fee set out in Schedule I and the rental for the first year of the lease at the rate set out in Schedule II.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527341" lims:id="527341"><Label>(3)</Label><Text>Every application for a lease shall be in duplicate and shall contain</Text><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527342" lims:id="527342"><Label>(a)</Label><Text>a description by metes and bounds of the land applied for;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527343" lims:id="527343"><Label>(b)</Label><Text>the type of material that the applicant desires to remove from the area;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527344" lims:id="527344"><Label>(c)</Label><Text>a sketch showing clearly the position of the parcel in relation to a survey monument, prominent topographical feature or other known point and showing in its margin, copies of the markings on the posts or cairns; and</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527345" lims:id="527345"><Label>(d)</Label><Text>an affidavit by the applicant setting forth</Text><Subparagraph lims:inforce-start-date="2016-06-13" lims:fid="527346" lims:id="527346"><Label>(i)</Label><Text>that they have complied with all the provisions of these Regulations, and</Text></Subparagraph><Subparagraph lims:inforce-start-date="2016-06-13" lims:fid="527347" lims:id="527347"><Label>(ii)</Label><Text>that the land contains material of the type applied for in merchantable quantities.</Text></Subparagraph></Paragraph></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527349" lims:id="527349">SOR/96-112, s. 1; SOR/2016-131, s. 7</HistoricalNoteSubItem></HistoricalNote></Section><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527350" lims:id="527350"><Label>7</Label><Text>The term of a lease shall not exceed 10 years.</Text></Section><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527351" lims:id="527351"><Label>8</Label><Text>A lessee shall, within such time from the date of the lease as the Minister may fix, commence the removal of the material or materials in merchantable quantities from the area under lease and shall continue the removal of materials to an extent and in a manner satisfactory to the Minister.</Text></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527352" lims:id="527352" level="1"><TitleText>Renewal of Lease</TitleText></Heading><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527353" lims:id="527353"><Label>9</Label><Text>Where, in the opinion of the Minister, the lessee has complied with the terms of their lease and these Regulations, the Minister may renew the lease for a further term not exceeding 10 years.</Text><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527355" lims:id="527355">SOR/2016-131, s. 8(E)</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527356" lims:id="527356" level="1"><TitleText>Loam, Sand, Gravel and Stone for Use of Residents</TitleText></Heading><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527357" lims:id="527357"><Label>10</Label><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527358" lims:id="527358"><Label>(1)</Label><Text>Subject to subsection (2), any person resident in the Northwest Territories or Nunavut may, without any charge or permit, take from territorial lands in any calendar year not more than</Text><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527359" lims:id="527359"><Label>(a)</Label><Text>10 cubic metres of loam; and</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527360" lims:id="527360"><Label>(b)</Label><Text>40 cubic metres of sand, gravel or stone.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527361" lims:id="527361"><Label>(2)</Label><Text>Subsection (1) applies only if</Text><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527362" lims:id="527362"><Label>(a)</Label><Text>no interest in the surface rights of the affected lands has been licensed, leased or otherwise disposed of by the Crown; and</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527363" lims:id="527363"><Label>(b)</Label><Text>the material taken is for the taker’s own use but not for barter or sale.</Text></Paragraph></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527365" lims:id="527365">SOR/2003-116, s. 18; SOR/2016-131, s. 9</HistoricalNoteSubItem></HistoricalNote></Section><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527366" lims:id="527366"><Label>11</Label><Text><Repealed>[Repealed, SOR/2016-131, s. 9]</Repealed></Text></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527367" lims:id="527367" level="1"><TitleText>Permits</TitleText></Heading><Section lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527368" lims:id="527368"><Label>12</Label><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527369" lims:id="527369"><Label>(1)</Label><Text>Any person may apply for a permit to take material from territorial lands by filing with a territorial land agent an application that</Text><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527370" lims:id="527370"><Label>(a)</Label><Text>is in the form prescribed by the Minister; and</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527371" lims:id="527371"><Label>(b)</Label><Text>subject to subsection (2), is accompanied by payment of the application fee set out in Schedule I and the royalties payable under section 14.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527372" lims:id="527372"><Label>(2)</Label><Text>There is no application fee and no royalty payable by any of the following persons or entities:</Text><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527373" lims:id="527373"><Label>(a)</Label><Text>a department of the Government of Canada;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527374" lims:id="527374"><Label>(b)</Label><Text>the Commissioner of the Northwest Territories;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527375" lims:id="527375"><Label>(c)</Label><Text>the Commissioner of Nunavut;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527376" lims:id="527376"><Label>(d)</Label><Text>any municipal district in the Northwest Territories or Nunavut;</Text></Paragraph><Paragraph lims:inforce-start-date="2016-06-13" lims:fid="527377" lims:id="527377"><Label>(e)</Label><Text>any educational, religious or charitable institution or hospital in the Northwest Territories or Nunavut.</Text></Paragraph></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527378" lims:id="527378"><Label>(2.1)</Label><Text>On receipt of an application referred to in subsection (1), the territorial land agent shall issue to the applicant a permit for a period based on the estimated dates of commencement and completion as set out in the permit application but not exceeding three years.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527379" lims:id="527379"><Label>(3)</Label><Text>Despite subsection (2.1), a permit expires on the day on which the quantity of material mentioned in the permit has been quarried and removed.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527380" lims:id="527380"><Label>(4)</Label><Text>A permit shall not be assigned.</Text></Subsection><Subsection lims:inforce-start-date="2016-06-13" lims:fid="527381" lims:id="527381"><Label>(5)</Label><Text>If a permittee has not complied with these Regulations or the conditions of their permit, the Minister may cancel the permit.</Text></Subsection><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527383" lims:id="527383">SOR/96-112, s. 2; SOR/2003-116, s. 20; SOR/2016-131, s. 10</HistoricalNoteSubItem></HistoricalNote></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527384" lims:id="527384" level="1"><TitleText>Reservations</TitleText></Heading><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527385" lims:id="527385"><Label>13</Label><Subsection lims:inforce-start-date="2006-03-22" lims:fid="527386" lims:id="527386"><Label>(1)</Label><Text>Where the area under a lease or permit issued pursuant to these Regulations is subject to an oil and gas permit or lease, or a recorded mineral claim, the lease or permit shall not authorize entry upon such area without first obtaining the permission of the Minister.</Text></Subsection><Subsection lims:inforce-start-date="2006-03-22" lims:fid="527387" lims:id="527387"><Label>(2)</Label><Text>The Minister may grant such permission subject to such conditions for the protection of the holder of the terminable grant as may be considered necessary.</Text></Subsection></Section><Heading lims:inforce-start-date="2016-06-13" lims:fid="527388" lims:id="527388" level="1"><TitleText>Fees and Royalties</TitleText></Heading><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527389" lims:id="527389"><Label>14</Label><Text>Except as provided in these Regulations, material taken by a lessee or permittee from lands described in a permit or lease is subject to the payment of royalties at the rates set out in Schedule II.</Text><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2006-03-22" lims:fid="527391" lims:id="527391">SOR/96-112, s. 3</HistoricalNoteSubItem></HistoricalNote></Section><Section lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527392" lims:id="527392"><Label>15</Label><Text>The fee set out in column II of an item of Schedule I is payable for the service set out in column I of that item.</Text><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2006-03-22" lims:fid="527394" lims:id="527394">SOR/96-112, s. 3</HistoricalNoteSubItem></HistoricalNote></Section></Body><Schedule lims:inforce-start-date="2006-03-22" lims:lastAmendedDate="2006-03-22" lims:fid="527395" lims:id="527395" spanlanguages="no" bilingual="no"><ScheduleFormHeading lims:inforce-start-date="2006-03-22" lims:fid="527396" lims:id="527396"><Label>SCHEDULE I</Label><OriginatingRef>(Sections 6, 12 and 15)</OriginatingRef></ScheduleFormHeading><TableGroup lims:inforce-start-date="2006-03-22" lims:fid="527397" lims:id="527397" pointsize="8" topmarginspacing="10" rowbreak="no" bilingual="no" spanlanguages="no"><table lims:inforce-start-date="2006-03-22" lims:fid="527398" lims:id="527398" frame="topbot"><title lims:inforce-start-date="2006-03-22" lims:fid="527399" lims:id="527399">Fees</title><tgroup lims:inforce-start-date="2006-03-22" lims:fid="527400" lims:id="527400" cols="3"><colspec colname="1" colwidth="59.22*" /><colspec colname="2" colwidth="278.63*" /><colspec colname="3" colwidth="130.15*" /><thead lims:inforce-start-date="2006-03-22" lims:fid="527401" lims:id="527401"><row topdouble="yes" topmarginspacing="4"><entry colsep="0" rowsep="0" valign="top" /><entry colsep="0" rowsep="0" valign="top">Column I</entry><entry colsep="0" rowsep="0" valign="top">Column II</entry></row><row topmarginspacing="6"><entry colsep="0" rowsep="1" valign="bottom">Item</entry><entry colsep="0" rowsep="1" valign="bottom">Service</entry><entry colsep="0" rowsep="1" valign="bottom">Fee</entry></row></thead><tbody lims:inforce-start-date="2006-03-22" lims:fid="527402" lims:id="527402"><row><entry colname="1" colsep="0" rowsep="0" valign="top">1</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Copies of documents</entry><entry colname="3" colsep="0" rowsep="0" valign="top">$ 1.00 per page</entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top">2</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Lease application</entry><entry colname="3" colsep="0" rowsep="0" valign="top">150.00</entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top">3</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Permit application</entry><entry colname="3" colsep="0" rowsep="0" valign="top">150.00</entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top">4</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Assignment of lease</entry><entry colname="3" colsep="0" rowsep="0" valign="top">50.00</entry></row></tbody></tgroup></table></TableGroup><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2006-03-22" lims:fid="527404" lims:id="527404">SOR/96-112, s. 4</HistoricalNoteSubItem></HistoricalNote></Schedule><Schedule lims:inforce-start-date="2016-06-13" lims:lastAmendedDate="2016-06-13" lims:fid="527405" lims:id="527405" bilingual="no" spanlanguages="no"><ScheduleFormHeading lims:inforce-start-date="2016-06-13" lims:fid="527406" lims:id="527406"><Label>SCHEDULE II</Label><OriginatingRef>(Subsection 6(2) and section 14)</OriginatingRef></ScheduleFormHeading><TableGroup lims:inforce-start-date="2016-06-13" lims:fid="527407" lims:id="527407" pointsize="8" topmarginspacing="10" rowbreak="no" bilingual="no" spanlanguages="no"><table lims:inforce-start-date="2016-06-13" lims:fid="527408" lims:id="527408" frame="topbot"><title lims:inforce-start-date="2016-06-13" lims:fid="527409" lims:id="527409">Rentals and Royalties</title><tgroup lims:inforce-start-date="2016-06-13" lims:fid="527410" lims:id="527410" cols="3"><colspec colname="1" colwidth="63.88*" /><colspec colname="2" colwidth="269.69*" /><colspec align="left" colname="3" colwidth="134.43*" /><thead lims:inforce-start-date="2016-06-13" lims:fid="527411" lims:id="527411"><row topdouble="yes" topmarginspacing="4"><entry colsep="0" rowsep="0" valign="top" /><entry colsep="0" rowsep="0" valign="top">Column I</entry><entry colsep="0" rowsep="0" valign="top">Column II</entry></row><row topmarginspacing="6"><entry colsep="0" rowsep="1" valign="bottom">Item</entry><entry colsep="0" rowsep="1" valign="bottom">Rental or Royalty</entry><entry colsep="0" rowsep="1" valign="bottom">Rate ($)</entry></row></thead><tbody lims:inforce-start-date="2016-06-13" lims:fid="527412" lims:id="527412"><row><entry colname="1" colsep="0" rowsep="0" valign="top">1</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Rental for first year of lease</entry><entry colname="3" colsep="0" rowsep="0" valign="top">100.00/ha</entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top">2</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Royalty on sand, gravel or loam</entry><entry colname="3" colsep="0" rowsep="0" valign="top">1.50/m<Sup>3</Sup></entry></row><row><entry colname="1" colsep="0" rowsep="0" valign="top">3</entry><entry colname="2" colsep="0" rowsep="0" valign="top">Royalty on other material</entry><entry colname="3" colsep="0" rowsep="0" valign="top">1.25/m<Sup>3</Sup></entry></row></tbody></tgroup></table></TableGroup><HistoricalNote><HistoricalNoteSubItem lims:inforce-start-date="2016-06-13" lims:fid="527414" lims:id="527414">SOR/96-112, s. 4; SOR/2016-131, s. 11</HistoricalNoteSubItem></HistoricalNote></Schedule></Regulation>