Canada Oil and Gas Land Regulations (C.R.C., c. 1518)

Regulations are current to 2013-05-20

SCHEDULE II

(ss. 40, 42 and 80)

DEPOSITS

Column IColumn II
PeriodDeposit
1.The first 18-month period of the original term in the case of a permit referred to in subsection 36(1), (2), (3) or (5) or paragraph 36(6)(b),$0.05 for each acre to be included in the permit.
2.The first 36-month period of the original term in the case of a permit referred to in subsection 36(4) or paragraph 36(6)(a),$0.05 for each acre to be included in the permit.
3.The second 18-month period of the original term in the case of a permit referred to in subsection 36(1),$0.15 for each acre included in the permit.
4.The 30-month period of the original term next following the first 18-month period of the original term in the case of a permit referred to in subsection 36(2), (3) or (5) or paragraph 36(6)(b),$0.15 for each acre included in the permit.
5.
  • (a
    The second 36-month period of the original term in the case of a permit referred to in subsection 36(4) or paragraph 36(6)(a), and
  • (b
    the first renewal period in the case of a permit referred to in subsection 36(4) or (6),
$0.15 for each acre included in the permit.
6.
  • (a
    The 24-month period of the original term next following the 30-month period referred to in item 4 in the case of a permit referred to in subsection 36(3) or (5) or paragraph 36(6)(b),
  • (b
    the first renewal period in the case of a permit referred to in subsection 36(3) or (5),
  • (c
    the 24-month period of the original term following the second 36-month period of the original term in the case of a permit referred to in paragraph 36(6)(a), and
  • (d
    the second renewal period in the case of a permit referred to in subsection 36(5) or (6),
$0.20 for each acre included in the permit.
7.The first renewal period of a permit referred to in subsection 36(1) or (2); and the second renewal period of a permit referred to in subsection 36(3) or (4),$0.30 for each acre included in the permit.
8.
  • (a
    The second renewal period in the case of a permit referred to in subsection 36(1) or (2), and
  • (b
    the third renewal period in the case of a permit referred to in subsection 36(5) or (6),
$0.40 for each acre included in the permit.
9.The third renewal period, except for a permit referred to in subsection 36(5) or (6),$0.50 for each acre included in the permit.
10.The fourth renewal period,$0.50 for each acre included in the permit.
11.The fifth renewal period,$0.50 for each acre included in the permit.
12.The sixth renewal period,$0.50 for each acre included in the permit.
13.The period of an extension granted pursuant to section 39,$0.10 for each acre included in the permit.